Memaparkan catatan dengan label GLC. Papar semua catatan
Memaparkan catatan dengan label GLC. Papar semua catatan

Ahad, Oktober 28, 2012

MALAYSIA AIRPORTS BERHAD CAUGHT WITH PANTS DOWN

MAB caught with pants down – Masidi

 KOTA KINABALU: Malaysia Airports Berhad (MAB) should learn a valuable lesson from the failure of runway lights at Terminal One of Kota Kinabalu Internatio 28/10/2012nal Airport (KKIA) on Thursday, said Tourism, Culture and Environment Minister Datuk Masidi Manjun.

He said the runway lighting debacle was something waiting to happen, but it should have been foreseen and avoided as it was the second runway lights failure in six months.

“Obviously, MAB was caught with its pants down. It did not have Plan B to deal with emergency situation of this kind as it did not have the foresight to reasonably assume that it could happen, even if it is only a remote possibility.

Jumaat, Mei 04, 2012

PITY SABAH LOSING ON EVERY ENDS

PITY SABAH LOSING ON EVERY ENDS

RANAU : A State Reform Party (Star) leader claimed that Sabah had lost every opportunities to Malaya and is losing even more as greed entrenched itself in the ruling elites who could easily find a matching capitalists.

Star's division head for Ranau, Jalibin Paidi, in a statement here said if one reflects long enough on this point, he or she would agree with his finding that Sabah had always been at the receiving end of Malayan mannouvres in the state, both politically and economically.

Take FELDA as example, he said, the Federal agency now has 300,000 acres of land in Lahad Datu and Kinabatangan. FELDA reaps around RM3 billion profits annually from its Sabah palm oil plantation. How many have we lost here for the last decades? he asked.

Rabu, November 16, 2011

WHAT HAPPENED TO FELDA’S 110,000 HECTARES (THE SIZE OF PENANG) IN TUNKU, LAHAD DATU?

SAPP: What happened to Felda's 110,000ha in Tunku, Lahad Datu?

Lahad Datu Nov 16, 2011: SAPP assistant secretary general, Datu Shuib Datu Mutalib wants to know what has become of 110,053 hectares (271,831 acres) of Felda land in Tungku, Lahad Datu.

He said based on parliament reports, Felda land in Sabah amounts to about 119,765 hectares (295,817 acres) with Felda Sahabat ,Tungku, Lahad Datu 88,528 hectares (217,798 acres) while, Felda Umas, Tawau some 31,182 hectares (77,021 acres), all planted with oil palm.

"The question here is, if, all the pioneers were given the 6.07 hectares (15 acres) per person, the 1,600 pioneers will utilise 9,712 hectares (24,000 acres).

"What happened to the 110,053 hectares (271,831 acres)?"

Jumaat, Ogos 19, 2011

SABAH GLCS SHOULD HELP LOCAL CONTRACTORS, NOT COMPETE WITH THEM IN SECURING OIL & GAS CONTRACTS

Help and not compete with local contractors – association

image KOTA KINABALU August 19, 2011: Government-linked companies (GLCs) should help local contractors, not compete with them in securing oil and gas contracts, said the Sabah Oil and Gas Contractors Association (SOGCA).

“Well-established GLCs should be the ones supporting the local companies and ensure that they can participate more actively in this rapidly growing industry,” said its president, Datuk Iskandar Abdul Malik.

Sabtu, Ogos 14, 2010

GOVT MUST CONSIDER LIBERALISING M’SIA’S OIL, GAS SECTOR: DR CHUA

Govt must consider liberalising M’sia’s oil, gas sector: Dr Chua

KUALA LUMPUR: The Government should consider liberalising the Malaysia’s oil and gas sector for the country to achieve accelerated growth, said MCA president Datuk Seri Dr Chua Soi Lek on Saturday.

He said the Government should also allow more of non-Bumiputra investors to be joint-venture partners, contractors and sub-contractors in areas such as exploration, platform constructions, logistics, deep-sea operations and others.

“Our oil and gas sector has reached a stage in which we are already an established player in the global stage. Yet the opportunities for the SMEs are still small compared to other countries including non-oil producing nations like Singapore.

“Therefore, given the maturity of the sector, the opening up of the sector will boost the country’s GDP by many folds,” he said at MCA’s Chinese Economic Congress at the Prince Hotel here on Saturday.

He said the telecommunication sector also needed to be fully liberalised as increased competition benefitted operators and consumers.

Dr Chua encouraged more GLCs to open their Board of Directors to include more non-Bumiputras as well as international expertise.

“It is important that GLCs open up their procurement system to include competitive SMEs based on the quality of service and products offered. Rather than based on race or equity requirement,” he said.

Dr Chua also called for greater transparency in the tendering process as closed tender systems had always been associated with corruption and kickbacks.

“We hope all public procurement is open to all local SMEs and they are provided with equal access and opportunities,” he said.

He said the party also called for the execution of a minimum wage policy on a sectoral and regional basis to accelerate the process of reducing the reliance on foreign labour.

Khamis, Mei 27, 2010

A BIG FROG IN A SMALL POND ;-)

mahathir

 

 

 

 

 

 

Mengulas lanjut mengenai Lee, Dr Mahathir berkata: "Beliau ibarat seekor katak yang besar di dalam kolam kecil. Beliau menyimpan hasrat untuk menjadi Perdana Menteri Malaysia."

 

image

Ketika ditanya, Plate berkata buku kedua dan seterusnya dalam siri itu akan menampilkan Dr Mahathir sendiri, yang digambarkan sebagai seorang lagi tokoh, "ahli silap mata Malaysia" yang berjaya melakukan transformasi ke atas negara itu seperti yang ada sekarang, di bawah pemerintahannya selama 22 tahun.

Khamis, Mei 20, 2010

IS LOSING RM1 BILLION ALSO ACCEPTABLE?

10. Sometimes, and I am not saying this of the contractor for the main project; sometimes very low price would be proposed so as to win the contract. Then as the construction is in progress there would be cost overruns and eventually the total cost would be far higher than the price of the bid. The owner of the project would be asked to pay for the new cost.

11. The Bakun hydro project was given to Sime Darby and Chinese partner at RM1.8 billion.

12. Now the CEO has been dismissed because of cost overrun in the Bakun project amounting to RM900 million. But I believe, and Sime Darby can correct me, the overrun is more than that because the Government has already compensated Sime Darby with about RM700 million. So total cost overrun would be almost equal to the bidded price of RM1.8 billion. The price has been doubled.

I think the people are entitled to know when a public company loses over a billion ringgit. Proton lost only RM500 million so that is acceptable. Is losing RM1 billion also acceptable?

Dr. Mahathir Mohamad

------------

The true story of Sime Darby — Dr Chan Chin Cheung